Our Nationwide Ground Projects

View ForteSOL’s ground improvement projects in Karachi, Lahore, Faisalabad & across Pakistan. We ensure safe, timely, and high-quality delivery. Explore our portfolio!

GROUND IMPROVEMENT SOLUTIONS

2016-2023

About Our Company

A Brief Story About The Company
ForteSOL stands at the forefront of ground improvement solutions in Pakistan, pioneering the application of robust engineered technology for soil improvement. With a proven track record, ForteSOL has successfully undertaken projects across Pakistan. We specialize in delivering highly curated ground improvement solutions to tackle individual project and client needs.

Hyundai Nishat Motor Projects

Hyundai Nishat Motor Pvt. Limited Ground Improvement for HNMPL Hostel Complex Faisalabad Hyundai Nishat Motor Pvt. Limited Strength Comparison EXISITNG IMPROVED 70 kPa 150 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via Stone columns INCREASE 2.14x

Read More »

INDUS HOME PROJECT’S

INDUS HOME LIMITED Ground Improvement for G+4 Storey Indus Home Stitching Apparel Building, 2.5 Km Off Manga Raiwind Road, Lahore_ Indus Home Limited Strength Comparison EXISITNG IMPROVED 60 kPa 200 kPa The Bearing Capacity achieved was 233.3% more than existing strength after Ground Improvement using Vibro replacement via Stone columns

Read More »

Apical Oil Terminal Projects

Apical Oil Terminal (Pvt.) Ltd Ground Improvement for Expansion of Apical Edible Oil Tank Terminal, Port Qasim, Karachi Strength Comparison EXISITNG IMPROVED 135 kPa 200 kPa The Bearing Capacity achieved was approximately 48.1% more than existing strength after Ground Improvement using Vibro replacement via Stone columns INCREASE 1.48x

Read More »

HYUNDAI NISHAT PROJECT’S

Hyundai Nishat Motor Pvt. Limited Ground Improvement for Mill Building, HNMPL Faisalabad – Hyundai Nishat Motor Pvt. Limited Strength Comparison EXISITNG IMPROVED 70 kPa 150 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via Stone columns INCREASE 2.14x

Read More »

MAPAK Edible Oils

MAPAK Edible Oils Ground Improvement for Grain Storage Silo in Port Qasim, Karachi in Grain Storage Silo of MAPAK Edible Oils Strength Comparison EXISITNG IMPROVED 70 kPa 150 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via 403 Stone columns

Read More »

Bulk Management Project’s

Bulk Management (Pvt.) Limited Ground Improvement for Warehouse in Port Qasim of Bulk Management Pvt Ltd. Strength Comparison EXISITNG IMPROVED 55 kPa 120 kPa The Bearing Capacity achieved was approximately 118% more than existing strength after Ground Improvement using Vibro replacement via 716 Stone columns with a 2.2 improvement factor

Read More »

IFFCO Pakistan Project’s

IFFCO Pakistan (Pvt.) Ltd. Ground Improvement at Port Qasim Project for IFFCO Pakistan Pvt. Ltd. Strength Comparison EXISITNG IMPROVED 50 kPa 200 kPa Improvement of soil through vibrorcompaction covering area of 35000sqm. Soil will sustain 5000ton capacity tank with diameter of 52m which is now constructed. INCREASE 3.0x

Read More »

SIUT SUKKUR

SIUT SUKKUR Ground Improvement work for Oncology complex at SIUT Sukkur Strength Comparison EXISITNG IMPROVED 40 kPa 120 kPa The Bearing Capacity achieved was approximately 118% more than existing strength after Ground Improvement using Vibro replacement via 716 Stone columns with a 2.2 improvement factor INCREASE 2.18x

Read More »

The Mangroove, Korangi creek

The Mangroove, Korangi creek Ground Improvement work for THE MANGROOVES, KORANGI CREEK, KARACHI Strength Comparison EXISITNG IMPROVED 60 kPa 200 kPa Improvement of soil through vibroreplacement using 609 stone columns at up to 14.0 m depth. INCREASE 3.0x

Read More »

Pakistan refinery limited

pakistan refinery limited Ground Improvement work at tank 56, PRL oil storage terminal, Kemari, Karachi. Strength Comparison EXISITNG IMPROVED 50 kPa 200 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via 403 Stone columns with a 2.2 improvement factor INCREASE

Read More »

DOlphin plaza, sukkur

DOlphin plaza, sukkur Ground Improvement work for DOLPHIN PLAZA, SUKKUR Strength Comparison EXISITNG IMPROVED 50 kPa 250 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via 403 Stone columns with a 2.2 improvement factor INCREASE 2.14x

Read More »

Sindh Mass Transit Authority

Sindh Mass Transit Authority Ground Improvement work at BRT Yellowline Bus Depot-II, near Indus Hospital, Korangi, Karachi. Strength Comparison EXISITNG IMPROVED 50 kPa 120 kPa The Bearing Capacity achieved was approximately 114% more than existing strength after Ground Improvement using Vibro replacement via 403 Stone columns with a 2.2 improvement

Read More »
Scroll to Top